I sealed and riveted the passenger side foot box aluminum today. We have aligned, drilled and painted the pieces last week, as you may have noticed in previous posts. Starting with the top piece, attached to the frame and inner wall:
Then attached to the "A" piece, which is also riveted to the frame:
Then the front and floor:
And then attach the top half to the outside piece:
Then glued and riveted to the rest:
I sealed the inside and touched up the paint a bit.
Since the video is too large, I'll be hosting it off youtube. Anyway, here is a time lapse of the process:
http://www.youtube.com/watch?v=n4XQy4HHzuI&feature=youtu.be
No comments:
Post a Comment
Comments will be held for moderation.