We are about 75% done with the electrical. Dad has been handling all that for the past few days. Here is a shot of the main cutoff switch to the battery, mounted right between the seats:
Ready for a battery! Ground strap and positive leads all installed. Next major step is the dash, which Dad has been working on.
Today I ran the hard brake lines from the two master cylinders out to the four wheels. It wasn't as sketchy as I thought. This is the junction right behind the driver's seat:
And the lines to the front, which follow the top chassis tube:
A top down view of the front lines. Still waiting on the lower steering shaft though:
And over to the rear passenger side. The battery box (on the lower right) is ready to be mounted once we get the rear-end in:
Dad worked on the fuel lines and we called it a day. I'll finish up the fuel pump install tomorrow.